North East Buses Local Bus Scene Operations, Management & Infrastructure Sunderland Area Developments - St Mary's Way, Vaux, New Wear Bridge etc

Sunderland Area Developments - St Mary's Way, Vaux, New Wear Bridge etc

Sunderland Area Developments - St Mary's Way, Vaux, New Wear Bridge etc

 
  • 0 Vote(s) - 0 Average
 
Pages (37): 1 2 337 Next
NEB Admin Team

Unregistered

 
03 Jan 2013, 9:14 pm #1
Planning permission has been granted to merge St Mary's Way and Livingstone Road in Sunderland City Centre to create a new tree-lined boulevard. This will make this route much more attractive and far better equipped to deal with the increasing levels of traffic this road will face when the Sunderland Strategic Transport Corridor is completed as a part of the new Wear Bridge and route to the Port in the East End. It's also to "prime" the Vaux site to attract private development as a new business district for the City Centre. The council think that private companies may be put-off developing Vaux if they have to shoulder the cost of the road layout improvements themselves; so Sunderland City Council are footing the bill themselves instead.

The boulevard, and the new Magistrates's Square on the site of the current roundabout, will sever the road link currently used by buses to access The Londonderry Hotel and Sunderland Empire Theatre.

The routes of these buses will be permanently changed as they become realigned to the new boulevard. Stagecoach service 8 City Centre - South Hylton, Stagecoach service 20 City Centre - Pennywell, Stagecoach services E1/E2/E6 South Shields - Sunderland; plus Go North East's X3, 9, 36 & 56 en-route to Park Lane Interchange. NexusBus 135/136 and Sunderland Connect 700 will also be diverted to travel along the full length of the new boulevard (701 doesn't currently serve Sunderland Empire Theatre / Londonderry Hotel anyway).

A dedicated bus lane will be included in the westbound direction, and will be served by routes 8, 20, E1/E2/E6, X3, 9, 36, 56 & 135. Only services 136 and 700/701 will travel in the eastbound direction, but these routes will still benefit from a dedicated bus bay and shelter.

For interest, I've enclosed a links to some images and a couple of site plans available from Sunderland City Council.

http://www.sunderland.gov.uk/index.aspx?articleid=6818

http://www.sunderland.gov.uk/Planning/St...cNo=695496&PageNo=1&content=obj.pdf

http://www.sunderland.gov.uk/Planning/St...cNo=695498&PageNo=1&content=obj.pdf

Advanced utility works are scheduled to start week commencing 14 January 2013. Details of the successful bidder to complete the works will be made in Spring 2013, with work on the new road starting in the summer. I'm led to believe that work on the new Magistrate's Square is supposed to start in Spring 2014 once the new boulevard opens, if my memory serves right.
NEB Admin Team
03 Jan 2013, 9:14 pm #1

Planning permission has been granted to merge St Mary's Way and Livingstone Road in Sunderland City Centre to create a new tree-lined boulevard. This will make this route much more attractive and far better equipped to deal with the increasing levels of traffic this road will face when the Sunderland Strategic Transport Corridor is completed as a part of the new Wear Bridge and route to the Port in the East End. It's also to "prime" the Vaux site to attract private development as a new business district for the City Centre. The council think that private companies may be put-off developing Vaux if they have to shoulder the cost of the road layout improvements themselves; so Sunderland City Council are footing the bill themselves instead.

The boulevard, and the new Magistrates's Square on the site of the current roundabout, will sever the road link currently used by buses to access The Londonderry Hotel and Sunderland Empire Theatre.

The routes of these buses will be permanently changed as they become realigned to the new boulevard. Stagecoach service 8 City Centre - South Hylton, Stagecoach service 20 City Centre - Pennywell, Stagecoach services E1/E2/E6 South Shields - Sunderland; plus Go North East's X3, 9, 36 & 56 en-route to Park Lane Interchange. NexusBus 135/136 and Sunderland Connect 700 will also be diverted to travel along the full length of the new boulevard (701 doesn't currently serve Sunderland Empire Theatre / Londonderry Hotel anyway).

A dedicated bus lane will be included in the westbound direction, and will be served by routes 8, 20, E1/E2/E6, X3, 9, 36, 56 & 135. Only services 136 and 700/701 will travel in the eastbound direction, but these routes will still benefit from a dedicated bus bay and shelter.

For interest, I've enclosed a links to some images and a couple of site plans available from Sunderland City Council.

http://www.sunderland.gov.uk/index.aspx?articleid=6818

http://www.sunderland.gov.uk/Planning/St...cNo=695496&PageNo=1&content=obj.pdf

http://www.sunderland.gov.uk/Planning/St...cNo=695498&PageNo=1&content=obj.pdf

Advanced utility works are scheduled to start week commencing 14 January 2013. Details of the successful bidder to complete the works will be made in Spring 2013, with work on the new road starting in the summer. I'm led to believe that work on the new Magistrate's Square is supposed to start in Spring 2014 once the new boulevard opens, if my memory serves right.

Michael



19,142
03 Jan 2013, 9:23 pm #2
Its a great idea, The road will be much better and have better access to top of the bridges (Primark) and to the vaux site, it looks great, what does it mean by utility works?

it looks like the road will be pushed out.
Edited 03 Jan 2013, 9:24 pm by Michael.

Ooo Friend, Bus Friend.
Michael
03 Jan 2013, 9:23 pm #2

Its a great idea, The road will be much better and have better access to top of the bridges (Primark) and to the vaux site, it looks great, what does it mean by utility works?

it looks like the road will be pushed out.


Ooo Friend, Bus Friend.

NEB Admin Team

Unregistered

 
03 Jan 2013, 9:25 pm #3
I think it's stuff like electricity, water, gas, sewer pipes/manholes that kind of thing. All has to be moved I guess... Smile

I agree, it will be tonnes better! Big Grin
NEB Admin Team
03 Jan 2013, 9:25 pm #3

I think it's stuff like electricity, water, gas, sewer pipes/manholes that kind of thing. All has to be moved I guess... Smile

I agree, it will be tonnes better! Big Grin

Michael



19,142
03 Jan 2013, 9:27 pm #4
(03 Jan 2013, 9:25 pm)Brandon I think it's stuff like electricity, water, gas, sewer pipes/manholes that kind of thing. All has to be moved I guess... Smile

ah right cheers, should be nice when its done, wonder how the road system will work once work starts on the road.

Lets hope the work on Fawcett street and that get done to

Ooo Friend, Bus Friend.
Michael
03 Jan 2013, 9:27 pm #4

(03 Jan 2013, 9:25 pm)Brandon I think it's stuff like electricity, water, gas, sewer pipes/manholes that kind of thing. All has to be moved I guess... Smile

ah right cheers, should be nice when its done, wonder how the road system will work once work starts on the road.

Lets hope the work on Fawcett street and that get done to


Ooo Friend, Bus Friend.

NEB Admin Team

Unregistered

 
03 Jan 2013, 9:41 pm #5
Fawcett Street - is this what you mean?

http://www.sunderlandecho.com/news/busin...-1-5151325

I can't remember if planning permission got granted for this or not. I hope it does. This should help reduce bus congestion a lot at the bottom of Fawcett Street, but I think the 12 will still have to stop there because it terminates on Fawcett Street and does the loop back around to Holmeside. I can't see why these works would cost £1 million though!

There were other plans to pedestrianise Fawcett Street a couple of years ago, heard nothing more about that idea though - http://www.sunderlandecho.com/news/local...-1-1110739
NEB Admin Team
03 Jan 2013, 9:41 pm #5

Fawcett Street - is this what you mean?

http://www.sunderlandecho.com/news/busin...-1-5151325

I can't remember if planning permission got granted for this or not. I hope it does. This should help reduce bus congestion a lot at the bottom of Fawcett Street, but I think the 12 will still have to stop there because it terminates on Fawcett Street and does the loop back around to Holmeside. I can't see why these works would cost £1 million though!

There were other plans to pedestrianise Fawcett Street a couple of years ago, heard nothing more about that idea though - http://www.sunderlandecho.com/news/local...-1-1110739

Michael



19,142
03 Jan 2013, 9:51 pm #6
(03 Jan 2013, 9:41 pm)Brandon Fawcett Street - is this what you mean?

http://www.sunderlandecho.com/news/busin...-1-5151325

I can't remember if planning permission got granted for this or not. I hope it does. This should help reduce bus congestion a lot at the bottom of Fawcett Street, but I think the 12 will still have to stop there because it terminates on Fawcett Street and does the loop back around to Holmeside. I can't see why these works would cost £1 million though!

There were other plans to pedestrianise Fawcett Street a couple of years ago, heard nothing more about that idea though - http://www.sunderlandecho.com/news/local...-1-1110739

Hmm i don't renember if it was granted or not but its a good idea, its best really if the 5/5A/10/11/39/42 all go straight down on to borough road, i think it is, where the 5/5A/10/11/18 or 19/39/42 come up towards Homeside

Ooo Friend, Bus Friend.
Michael
03 Jan 2013, 9:51 pm #6

(03 Jan 2013, 9:41 pm)Brandon Fawcett Street - is this what you mean?

http://www.sunderlandecho.com/news/busin...-1-5151325

I can't remember if planning permission got granted for this or not. I hope it does. This should help reduce bus congestion a lot at the bottom of Fawcett Street, but I think the 12 will still have to stop there because it terminates on Fawcett Street and does the loop back around to Holmeside. I can't see why these works would cost £1 million though!

There were other plans to pedestrianise Fawcett Street a couple of years ago, heard nothing more about that idea though - http://www.sunderlandecho.com/news/local...-1-1110739

Hmm i don't renember if it was granted or not but its a good idea, its best really if the 5/5A/10/11/39/42 all go straight down on to borough road, i think it is, where the 5/5A/10/11/18 or 19/39/42 come up towards Homeside


Ooo Friend, Bus Friend.

cbma06



2,669
12 Jan 2013, 5:58 pm #7
(03 Jan 2013, 9:41 pm)Brandon Fawcett Street - is this what you mean?

http://www.sunderlandecho.com/news/busin...-1-5151325

I can't remember if planning permission got granted for this or not. I hope it does. This should help reduce bus congestion a lot at the bottom of Fawcett Street, but I think the 12 will still have to stop there because it terminates on Fawcett Street and does the loop back around to Holmeside. I can't see why these works would cost £1 million though!

There were other plans to pedestrianise Fawcett Street a couple of years ago, heard nothing more about that idea though - http://www.sunderlandecho.com/news/local...-1-1110739

The council are going to be sending the buses all the way up Fawcett Street then onto the bridge (but not anytime soon though), I think there will be doing that when there re organise the layout at Wearmouth bridge entrance, as there be taking the dreadful roundabout away and putting in traffic lights control instead, there was a map somewhere showing the diagram of the lighting system that there propose to put in, and there was also a map about taking away the roundabout at St Michaels way and Livingstone road, there should do something about the tiny roundabout at bottom of Hylton Road, there should take it away and have it traffic light control and widen the road at each end, and there could use some of the land next to Silksworth Row for widening the road better, so it would be better for the flow of traffic coming from the new bridge into city centre.


cbma06
12 Jan 2013, 5:58 pm #7

(03 Jan 2013, 9:41 pm)Brandon Fawcett Street - is this what you mean?

http://www.sunderlandecho.com/news/busin...-1-5151325

I can't remember if planning permission got granted for this or not. I hope it does. This should help reduce bus congestion a lot at the bottom of Fawcett Street, but I think the 12 will still have to stop there because it terminates on Fawcett Street and does the loop back around to Holmeside. I can't see why these works would cost £1 million though!

There were other plans to pedestrianise Fawcett Street a couple of years ago, heard nothing more about that idea though - http://www.sunderlandecho.com/news/local...-1-1110739

The council are going to be sending the buses all the way up Fawcett Street then onto the bridge (but not anytime soon though), I think there will be doing that when there re organise the layout at Wearmouth bridge entrance, as there be taking the dreadful roundabout away and putting in traffic lights control instead, there was a map somewhere showing the diagram of the lighting system that there propose to put in, and there was also a map about taking away the roundabout at St Michaels way and Livingstone road, there should do something about the tiny roundabout at bottom of Hylton Road, there should take it away and have it traffic light control and widen the road at each end, and there could use some of the land next to Silksworth Row for widening the road better, so it would be better for the flow of traffic coming from the new bridge into city centre.



NEB Admin Team

Unregistered

 
12 Jan 2013, 6:00 pm #8
I uploaded a map of those junction improvements to the skyscraper city forums earlier this year - I'll try and find it again and upload it here. Smile



The page I linked to in that forum can no longer be found. Fortunately, the same document has been saved under a slightly different URL though still not easy to find by any means. The PDF is too large to upload - so here's the link:

http://www.newsunderlandbridge.com/page-...ds/6-6.pdf

The new junction plans can be found on Pages 23-25 of 59 of the main report.

Road plans of the new bridge and associated link roads can be found from Page 4 of 42 of this report:

http://www.newsunderlandbridge.com/page-...s/6-14.pdf
NEB Admin Team
12 Jan 2013, 6:00 pm #8

I uploaded a map of those junction improvements to the skyscraper city forums earlier this year - I'll try and find it again and upload it here. Smile



The page I linked to in that forum can no longer be found. Fortunately, the same document has been saved under a slightly different URL though still not easy to find by any means. The PDF is too large to upload - so here's the link:

http://www.newsunderlandbridge.com/page-...ds/6-6.pdf

The new junction plans can be found on Pages 23-25 of 59 of the main report.

Road plans of the new bridge and associated link roads can be found from Page 4 of 42 of this report:

http://www.newsunderlandbridge.com/page-...s/6-14.pdf

Michael



19,142
13 Jan 2013, 3:38 pm #9
I like the lay out for the roundabout to be taking up at the start of the bridge and changed to just traffic lights, think this would work but can u imagine the delays when the work is happening =(

i like the idea of buses being able to go straight down instead of going past the cinema, wasn't it like that years ago?

Ooo Friend, Bus Friend.
Michael
13 Jan 2013, 3:38 pm #9

I like the lay out for the roundabout to be taking up at the start of the bridge and changed to just traffic lights, think this would work but can u imagine the delays when the work is happening =(

i like the idea of buses being able to go straight down instead of going past the cinema, wasn't it like that years ago?


Ooo Friend, Bus Friend.

NEB Admin Team

Unregistered

 
14 Jan 2013, 7:21 pm #10
I know, the traffic would be horrendous during those works.

Fawcett Street was the route of the old A19 so had two-way traffic and opened directly onto the bridge. A few photos here all by Malcolm Fraser:

http://www.flickr.com/photos/26081643@N05/6092667629/

http://www.flickr.com/photos/26081643@N05/5855631225/

http://www.flickr.com/photos/26081643@N05/5645847036/

And a photo by cbma06 - [attachment=1508]

A lot different now! It would be such an improvement to have buses operating directly on to the bridge again from Fawcett Street.

About the new bridge and SSTC - I particularly like this bit:

"Public transport priority measures are proposed, including upgrading the existing ‘at-grade four arm roundabout’ on the A1231 Wessington Way, to a four-way signalised junction with bus priority measures to improve journey times.

The new crossing would also provide the facility for a new rapid centre to centre bus service between Washington and Sunderland; and should street running trams be part of future transport provision, the bridge deck has been designed to accommodate such loadings.

The Project also includes proposals to upgrade the existing signalised roundabout to the south of the Wearmouth Bridge (St Mary’s Way/ Wear St/ Bridge St junction) to enable two-way bus movements along Bridge Street. This is currently a key route for buses and is restricted to southbound only. Northbound buses currently have to take a circuitous route to the Wearmouth Bridge via Bedford Street and Wear Street.

The redistribution of traffic from the existing crossings to the New Wear Crossing and the surrounding network could facilitate the future introduction of bus lanes on the Wearmouth Bridge."
NEB Admin Team
14 Jan 2013, 7:21 pm #10

I know, the traffic would be horrendous during those works.

Fawcett Street was the route of the old A19 so had two-way traffic and opened directly onto the bridge. A few photos here all by Malcolm Fraser:

http://www.flickr.com/photos/26081643@N05/6092667629/

http://www.flickr.com/photos/26081643@N05/5855631225/

http://www.flickr.com/photos/26081643@N05/5645847036/

And a photo by cbma06 - [attachment=1508]

A lot different now! It would be such an improvement to have buses operating directly on to the bridge again from Fawcett Street.

About the new bridge and SSTC - I particularly like this bit:

"Public transport priority measures are proposed, including upgrading the existing ‘at-grade four arm roundabout’ on the A1231 Wessington Way, to a four-way signalised junction with bus priority measures to improve journey times.

The new crossing would also provide the facility for a new rapid centre to centre bus service between Washington and Sunderland; and should street running trams be part of future transport provision, the bridge deck has been designed to accommodate such loadings.

The Project also includes proposals to upgrade the existing signalised roundabout to the south of the Wearmouth Bridge (St Mary’s Way/ Wear St/ Bridge St junction) to enable two-way bus movements along Bridge Street. This is currently a key route for buses and is restricted to southbound only. Northbound buses currently have to take a circuitous route to the Wearmouth Bridge via Bedford Street and Wear Street.

The redistribution of traffic from the existing crossings to the New Wear Crossing and the surrounding network could facilitate the future introduction of bus lanes on the Wearmouth Bridge."

NEB Admin Team

Unregistered

 
26 Jan 2013, 2:27 pm #11
It seems that the upcoming realignment of St Mary's Way is already fetching some serious enquiries for imminent development on the adjacent Vaux site which is great news -

"As I've talked about before, the council has invested significantly in the Vaux site already through remedial work and the realignment of St Mary's Way, and this investment has already led to some serious enquiries from businesses looking for a city centre base, including some we're hopeful could come to fruition in the very near future."

http://www.sunderland.gov.uk/index.aspx?articleid=2108
NEB Admin Team
26 Jan 2013, 2:27 pm #11

It seems that the upcoming realignment of St Mary's Way is already fetching some serious enquiries for imminent development on the adjacent Vaux site which is great news -

"As I've talked about before, the council has invested significantly in the Vaux site already through remedial work and the realignment of St Mary's Way, and this investment has already led to some serious enquiries from businesses looking for a city centre base, including some we're hopeful could come to fruition in the very near future."

http://www.sunderland.gov.uk/index.aspx?articleid=2108

Michael



19,142
27 Jan 2013, 2:30 pm #12
=D that's great, hopefully when work is completed and last minute things being done, then people will look in to building on it

Ooo Friend, Bus Friend.
Michael
27 Jan 2013, 2:30 pm #12

=D that's great, hopefully when work is completed and last minute things being done, then people will look in to building on it


Ooo Friend, Bus Friend.

NEB Admin Team

Unregistered

 
11 Feb 2013, 7:43 pm #13
Latest from Sunderland Council -

We will continue to pursue the re-development of the above ground element of Sunderland Railway Station to enhance its appearance as a main gateway into the city. This will be undertaken in partnership with Nexus and Network Rail, with a view to works commencing during 2015/2016. Key activity during 2013/2014 will include site investigation works and the procurement of the construction work.

It better be impressive if it's going to take so long to get started! Tongue

I'd still prefer to have seen an integrated bus/metro/rail interchange on a part of the Holmeside Triangle though - (replacing Sunderland and Park Lane metro stations).
NEB Admin Team
11 Feb 2013, 7:43 pm #13

Latest from Sunderland Council -

We will continue to pursue the re-development of the above ground element of Sunderland Railway Station to enhance its appearance as a main gateway into the city. This will be undertaken in partnership with Nexus and Network Rail, with a view to works commencing during 2015/2016. Key activity during 2013/2014 will include site investigation works and the procurement of the construction work.

It better be impressive if it's going to take so long to get started! Tongue

I'd still prefer to have seen an integrated bus/metro/rail interchange on a part of the Holmeside Triangle though - (replacing Sunderland and Park Lane metro stations).

Michael



19,142
11 Feb 2013, 7:49 pm #14
Know its got nothing to do with Buses etc but

http://www.sunderland.gov.uk/index.aspx?articleid=7754

The City Council today secured £2m from the Government's Coastal Communities Fund, which with £800,000 in Council match funding, will deliver further infrastructure works designed to pave the way for the long term development of the Ocean Park site and the seafront at Seaburn.

The City Council is currently seeking a development partner for the 7.37 hectare Ocean Park site which has been underused for a number of years and is also putting £800,000 of its own funding into the improvements at Seaburn as part of the scheme.

The £2.8m will support the delivery of essential infrastructure work, which in the long term will facilitate the comprehensive redevelopment of Ocean Park by a private sector developer, in line with the Seafront Regeneration Strategy and Seaburn Masterplan

The planned infrastructure improvements will include:
A second phase of promenade improvements
Improvements to Lowry Road behind Martinos to improve traffic flow
Environmental improvements to Cut Throat Dene to make it more attractive for wildlife and more of a natural play area in line with the Seaburn masterplan
Physical and environmental improvements to Whitburn Road including improved crossing points to improve the pedestrian environment, in line with views expressed during the 2009 seafront consultation

Great news, there's some designs on the page, would love to see the fairground redeveloped and opened

Ooo Friend, Bus Friend.
Michael
11 Feb 2013, 7:49 pm #14

Know its got nothing to do with Buses etc but

http://www.sunderland.gov.uk/index.aspx?articleid=7754

The City Council today secured £2m from the Government's Coastal Communities Fund, which with £800,000 in Council match funding, will deliver further infrastructure works designed to pave the way for the long term development of the Ocean Park site and the seafront at Seaburn.

The City Council is currently seeking a development partner for the 7.37 hectare Ocean Park site which has been underused for a number of years and is also putting £800,000 of its own funding into the improvements at Seaburn as part of the scheme.

The £2.8m will support the delivery of essential infrastructure work, which in the long term will facilitate the comprehensive redevelopment of Ocean Park by a private sector developer, in line with the Seafront Regeneration Strategy and Seaburn Masterplan

The planned infrastructure improvements will include:
A second phase of promenade improvements
Improvements to Lowry Road behind Martinos to improve traffic flow
Environmental improvements to Cut Throat Dene to make it more attractive for wildlife and more of a natural play area in line with the Seaburn masterplan
Physical and environmental improvements to Whitburn Road including improved crossing points to improve the pedestrian environment, in line with views expressed during the 2009 seafront consultation

Great news, there's some designs on the page, would love to see the fairground redeveloped and opened


Ooo Friend, Bus Friend.

Michael



19,142
24 Apr 2013, 8:08 pm #15
Haven't posted on here for a while so..


When does the work start on St Mary's Way for the new road layout, i looked on the first page with bidder annouced in Spring and work starting in summer... so my new question is... has any1 being found to do the work or will this be a delay, like normal?

Also

When is the work finished on Fawcett street/Burton road etc, it all most seems done, there doing gas works atm and the new road layout seems better.
Edited 24 Apr 2013, 8:11 pm by Michael.

Ooo Friend, Bus Friend.
Michael
24 Apr 2013, 8:08 pm #15

Haven't posted on here for a while so..


When does the work start on St Mary's Way for the new road layout, i looked on the first page with bidder annouced in Spring and work starting in summer... so my new question is... has any1 being found to do the work or will this be a delay, like normal?

Also

When is the work finished on Fawcett street/Burton road etc, it all most seems done, there doing gas works atm and the new road layout seems better.


Ooo Friend, Bus Friend.

Andreos1



14,155
24 Apr 2013, 8:14 pm #16
Just googled it and found this http://www.sunderlandecho.com/news/busin...-1-5332686

Not sure if there's any other developments

Edit: found this http://www.sunderland.gov.uk/index.aspx?articleid=6818
Edited 24 Apr 2013, 8:28 pm by Andreos1.
Andreos1
24 Apr 2013, 8:14 pm #16

Just googled it and found this http://www.sunderlandecho.com/news/busin...-1-5332686

Not sure if there's any other developments

Edit: found this http://www.sunderland.gov.uk/index.aspx?articleid=6818

Michael



19,142
25 Apr 2013, 5:24 am #17
Cheers so its the summer its supost to start... Worst time.. Concerts at the stadium of light and the Sunderland airshow

Hopefully the new road will be done first then the old road will be shut or i can see it being a knightmare just like the wheatchef...

Ooo Friend, Bus Friend.
Michael
25 Apr 2013, 5:24 am #17

Cheers so its the summer its supost to start... Worst time.. Concerts at the stadium of light and the Sunderland airshow

Hopefully the new road will be done first then the old road will be shut or i can see it being a knightmare just like the wheatchef...


Ooo Friend, Bus Friend.

Andreos1



14,155
25 Apr 2013, 6:11 pm #18
Yes, apparently the Summer it is...

I reckon there will be some sort of impact on all the summer's events.
Andreos1
25 Apr 2013, 6:11 pm #18

Yes, apparently the Summer it is...

I reckon there will be some sort of impact on all the summer's events.

Michael



19,142
24 Jul 2013, 10:11 am #19
Didnt know where to place it but Borough road has being completed just seen the number 10 stop at the bus stop thier.

Sure ive just read a sign for gas works on homeside from startbof next month... that will fun alright with st marys getting worked on..

Ooo Friend, Bus Friend.
Michael
24 Jul 2013, 10:11 am #19

Didnt know where to place it but Borough road has being completed just seen the number 10 stop at the bus stop thier.

Sure ive just read a sign for gas works on homeside from startbof next month... that will fun alright with st marys getting worked on..


Ooo Friend, Bus Friend.

cbma06



2,669
16 Aug 2013, 10:51 am #20
A NEW “town” will be created with hundreds of jobs in a scheme reportedly worth more than £100m, after plans to build hundreds of homes along with a range of facilities were approved.

The huge investment by Esh Developments on land off Philadelphia Lane with see 630 homes built, along with a supermarket, petrol station, shops and a learning and enterprise centre.

There will also be improvements to listed buildings, including the former power station, and new roads, woodland, footpaths and cycle links.

Sunderland City Council’s planning and highways committee last night voted to allow the redevelopment of the Philadelphia depot and surrounding area, leading up to New Herrington.

source: http://www.sunderlandecho.com/news/busin...-1-5959100


cbma06
16 Aug 2013, 10:51 am #20

A NEW “town” will be created with hundreds of jobs in a scheme reportedly worth more than £100m, after plans to build hundreds of homes along with a range of facilities were approved.

The huge investment by Esh Developments on land off Philadelphia Lane with see 630 homes built, along with a supermarket, petrol station, shops and a learning and enterprise centre.

There will also be improvements to listed buildings, including the former power station, and new roads, woodland, footpaths and cycle links.

Sunderland City Council’s planning and highways committee last night voted to allow the redevelopment of the Philadelphia depot and surrounding area, leading up to New Herrington.

source: http://www.sunderlandecho.com/news/busin...-1-5959100