Stagecoach North East: Upcoming Service Changes - Michael - 16 Jun 2014

All changes for Stagecoach from VOSA go here or any upcoming changes!


RE: Stagecoach bus changes - Michael - 16 Jun 2014

Changes to Services 3, 5/5A, 10, 11, 13, 16 and 20 from Sunday 22 June 2014

http://www.stagecoachbus.com/tis-service-update-details.aspx?id=1893


RE: Stagecoach bus changes - Michael - 05 Jul 2014

Disruptions due to Summer Festival Parade on Saturday 5 July 2014

We have been advised that the Summer Festival Opening Parade will be taking place on Saturday 5 July 2014.

Last Updated: 30 June 2014 11:42 AM

To ensure health and safety is maintained, Ocean Road and parts of Sea Road will need to be closed between approximately 1230 – 1430.

During affected times, Service E1 and the Open Top City Sightseeing buses will be required to divert between South Shields Town Centre and New Crown Hotel via Anderson Street, Beach Road, Salisbury Place, Sea Way and Bents Park Road in both directions, observing all stops along the line of the diversionary route.

In addition, all services in the town may also be temporarily delayed by a rolling road closure along Fowler Street, or may be diverted away from the affected area. As a consequence of these road closures, buses are likely to be unable to serve the bus stops at Keppel Street, Fowler Street or Town Hall between approx 1230 - 1330, with all bus services in the town diverting via Station Road.

Although our local authority colleagues will endeavour to ensure that the impact on bus services is as limited as possible, there is still likely to be significant traffic congestion in the town centre area and along Ocean Road.

Due to the various road closures, and the congestion that will be created due to traffic displacement, all bus services may be subject to delay, or may be temporary diverted around the affected areas. Stagecoach apologise for any inconvenience or delays this event may cause, which is due to circumstances beyond our control.

Services Affected: 1, 2, 3, 4, 7, 8, 10, 11, 12, 17, 18, 30, E1, E2, E6, X20

Originally Posted: 06 June 2014 12:17 PM


RE: Stagecoach bus changes - Michael - 05 Jul 2014

(05 Jul 2014, 10:05 am)AIG20 wrote I assume the information relating to the Airshow (including the shuttle service 510 and the revised "E" services) will be uploaded onto the website on Monday or some time next week, as Stagecoach usually give a month's notice of all the changes/disruptions that are going to occur.

Looks like that way, should be the same as last year.


GNE have theirs on and it has the 26/26A on....


RE: Stagecoach bus changes - Michael - 14 Jul 2014

PB0002404/71 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between South Shields and Newcastle given service number 553 effective from 07-Sep-2014. To amend Timetable.

PB0002404/306 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Cancellation Accepted: Operating between South Shields Anderson Street and Newcastle given service number 554 effective from 07-Sep-2014.


RE: Stagecoach bus changes - Dan - 14 Jul 2014

(14 Jul 2014, 11:12 am)AIG20 wrote I wonder whether some Gas Buses will be used alongside the E400s this year, instead of Slatyford's MAN ALX300s.

Would be a good idea - but Slatyford drivers would then need to receive driver familiarisation, unless Sunderland were going to operate them instead.


RE: Stagecoach bus changes - Michael - 16 Jul 2014

Couple of road closures in Sunderland

4th Field Regiment parade in Sunderland - Saturday 4 August 2014 -
http://www.stagecoachbus.com/tis-service-update-details.aspx?id=2475


Southwick Summer Streets Parade - Saturday 19 July 2014 - http://www.stagecoachbus.com/tis-service-update-details.aspx?id=2474


RE: Stagecoach bus changes - Michael - 17 Jul 2014

Temporary closure of Burdon Road, affecting Services 8, 20 and E1, E2, E6- http://www.stagecoachbus.com/tis-service-update-details.aspx?id=2509

“Colour run” at Sunderland Stadium of Light – Sunday 20 July 2014 -
http://www.stagecoachbus.com/tis-service-update-details.aspx?id=2505


RE: Stagecoach bus changes - Michael - 22 Jul 2014

Once again....

Temporary westbound closure of Durham Road, affecting Services 3, 4, 23

On Sunday 10 August 2014, Durham Road will be closed to westbound traffic at the Tudor Grove junction whilst the carriageway is resurfaced.

Last Updated: 22 July 2014 2:03 PM

These roadworks are programmed to be in place during Sunday 10 August 2014 only, between approximately 0800 and 1800.

During the periods of the road closure, Service 3, 4, and 23 buses towards Thorney Close, Farringdon and Doxford Park will be required to divert from Barnes Park non-stop via Silksworth Lane and Premier Road. Buses will thus be unable to serve their westbound stops along Durham Road between Barnes Park and the Prospect junction.

Northbound Service 3, 4 and 23 buses (towards Sunderland City Centre) will be unaffected by these works.

Stagecoach would like to apologise for any inconvenience these temporary works authorised by Sunderland City Council may cause, and we remain grateful for customers’ patience and understanding.

Services Affected: 3, 4, 23

Originally Posted: 22 July 2014 2:02 PM


RE: Stagecoach bus changes - Michael - 23 Jul 2014

Closure of Queen Alexandra Road, affecting Services 18 and 19

From Monday 4 August 2014, Queen Alexandra Road will be closed between Tunstall Road and Ashbrooke Range to resurface the carriageway.

Last Updated: 22 July 2014 1:53 PM

These roadworks are likely to be in place from Monday 4 August 2014, for around 4 days, generally between 0800 - 1800.

During the periods of the road closure, Services 18 and 19 will be unable to serve Tunstall Road, Queen Alexandra Road, Sea View Road West or the Eye Hospital. Buses will instead operate via Leechmere Road and Helvellyn Road, u-turning at the Hill View Road roundabout.

Stagecoach would like to apologise for any inconvenience these temporary works authorised by Sunderland City Council may cause, and we remain grateful for customers’ patience and understanding.

Services Affected: 18, 19

Originally Posted: 22 July 2014 1:45 PM


RE: Stagecoach bus changes - Michael - 24 Jul 2014

Temporary southbound closure of Bedford Street, affecting Services 3, 4, 13, 16, 23, E1, E2 and E6

On Sundays 3 and 10 August 2014, Bedford Street will be temporarily closed to all southbound traffic to enable carriageway works.

Last Updated: 23 July 2014 6:42 PM

These roadworks are programmed to be in place during Sundays 3 and 10 August 2014, between approximately 0700 and 1800.

During the periods of the road closure, southbound Services 3, 4, 13, 16, 23, E1, E2 and E6 will be required to operate non-stop via West Wear Street and High Street West into John Street.

Whilst there will be no bus stops omitted by the southbound route, the increase in mileage may result in some minor delays to services.

There will be no affect on the route of northbound buses.

Stagecoach would like to apologise for any inconvenience these temporary works authorised by Sunderland City Council may cause, and we remain grateful for customers’ patience and understanding.

Services Affected: 3, 4, 13, 16, 23, E1, E2, E6

Originally Posted: 23 July 2014 6:41 PM


RE: Stagecoach bus changes - Michael - 28 Jul 2014

PB0002404/77 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Sunderland John Street and Doxford International given service number X1 effective from 22-Sep-2014. To amend Stopping Places and Timetable.


RE: Stagecoach bus changes - Michael - 05 Aug 2014

Minor change to Service X1 from Monday 22 September 2014

Following customer requests, all Service X1 journeys are revised to additionally stop on Bede Bank, outside Sunderland College.

Last Updated: 04 August 2014 6:06 PM

To improve connections for customers, most Service X1 journeys are also slightly retimed, and will operate up to 5 minutes later.

http://www.stagecoachbus.com/PdfUploads/Timetable_57957_X1.pdf - New timetable here

Services Affected: X1

Originally Posted: 04 August 2014 6:05 PM


RE: Stagecoach bus changes - Michael - 07 Aug 2014

Special bus services on Great North Run Day

On Sunday 7 September, special Services 552 and 553 will operate between the finish line and Newcastle City Centre or South Shields Ferry.

Last Updated: 07 August 2014 4:46 PM

Also, due to temporary road closures associated with the Great North Run, many Stagecoach buses within South Shields will also be temporarily revised, with some services not running until later in the afternoon.

http://www.stagecoachbus.com/great-north-run-south-shields.aspx

Services Affected: 1, 2, 3, 4, 7, 8, 10, 11, 12, 12A, 17, 18, 30, 574, 575, E1, E2, E6, X20

Originally Posted: 07 August 2014 4:37 PM


RE: Stagecoach bus changes - Michael - 08 Aug 2014

(08 Aug 2014, 7:43 pm)AIG20 wrote All services that use the Wearmouth Bridge during the closures will divert via the "Queen Alexandra Bridge" instead.

Closures of Monkwearmouth Bridgehead Roundabout, affecting Services 3,4,5A,13,16,23,E1,E2,E6:


Gonna be really fun


RE: Stagecoach bus changes - Michael - 08 Aug 2014

(08 Aug 2014, 7:49 pm)AIG20 wrote In addition, nothing has been mentioned on the Nexus and GNE website yet.

Surprised at NEXUS... doesn't surprise me with GNE tbh, even though someone posted about it the other day


RE: Stagecoach bus changes - Dan - 08 Aug 2014

(08 Aug 2014, 7:51 pm)Michael wrote Surprised at NEXUS... doesn't surprise me with GNE tbh, even though someone posted about it the other day

I've mentioned it to Go North East; as I said before, the council has not discussed the works with Go North East yet.

Clearly Stagecoach has pestered the council a lot more than Go North East.


RE: Stagecoach bus changes - Michael - 08 Aug 2014

(08 Aug 2014, 7:53 pm)Dan wrote I've mentioned it to Go North East; as I said before, the council has not discussed the works with Go North East yet.

Clearly Stagecoach has pestered the council a lot more than Go North East.

It says:

In our most recent discussions, we have been able to agree with Sunderland City Council for the bridgehead to remain open, as a “bus only route” during the main daytime period of Sunday 17 August 2014, during which period it will be closed to all other traffic.

Soooo least Stagecoach have tried... GNE will wait till last minute like always and they will claim to of only known from that day..


RE: Stagecoach bus changes - Dan - 08 Aug 2014

(08 Aug 2014, 7:54 pm)Michael wrote It says:

In our most recent discussions, we have been able to agree with Sunderland City Council for the bridgehead to remain open, as a “bus only route” during the main daytime period of Sunday 17 August 2014, during which period it will be closed to all other traffic.

Soooo least Stagecoach have tried... GNE will wait till last minute like always and they will claim to of only known from that day..

Go North East has tried too. I'd actually say they're pretty good at keeping customers informed well in advance, and it's quite unusual for them to give less than week's notice in this case.

Like I say, when I gave them the head's up about it, they would have got in touch with the council then - but clearly got no where.

Stagecoach would have only received this information today, otherwise they would have had it on the website sooner. How do we know that Go North East hasn't just received the same information today too?


RE: Stagecoach bus changes - Michael - 08 Aug 2014

(08 Aug 2014, 7:55 pm)AIG20 wrote I wonder how much it will effect the PVR/layover time on these services, as they may include shorter breaks for the drivers and more/less buses may be needed.

In addition, if the whole of "North Bridge Street" is closed on the evenings it may make it much harder for the buses to get to and from the depot.

The whole area, like the road and the roundabout/bridge should be done soon, leaving only the square left... i'm hoping they open both roads, including the new road leading to the car park while still working on the new square... and not waiting till the square is done to open it fully..


RE: Stagecoach bus changes - Adrian - 08 Aug 2014

(08 Aug 2014, 7:43 pm)AIG20 wrote All services that use the Wearmouth Bridge during the closures will divert via the "Queen Alexandra Bridge" instead.

Closures of Monkwearmouth Bridgehead Roundabout, affecting Services 3,4,5A,13,16,23,E1,E2,E6:

This is a joke. I don't blame the operators for trying to make do of a bad situation, but the fact the council have not thought about public transport operations at all here. It's an absolute disgrace that they haven't consulted with Go North East yet, despite them (along with Stagecoach) being a major stakeholder here.


RE: Stagecoach bus changes - Roland Pratt - 09 Aug 2014

(08 Aug 2014, 8:02 pm)aureolin wrote This is a joke. I don't blame the operators for trying to make do of a bad situation, but the fact the council have not thought about public transport operations at all here. It's an absolute disgrace that they haven't consulted with Go North East yet, despite them (along with Stagecoach) being a major stakeholder here.

Its the same in Middlesbrough and Stockton. The Councils shut off major bus routes at the drop of a hat for any excuse.


RE: Stagecoach bus changes - Dan - 09 Aug 2014

(05 Aug 2014, 8:45 am)Michael wrote Minor change to Service X1 from Monday 22 September 2014

Following customer requests, all Service X1 journeys are revised to additionally stop on Bede Bank, outside Sunderland College.

Last Updated: 04 August 2014 6:06 PM

To improve connections for customers, most Service X1 journeys are also slightly retimed, and will operate up to 5 minutes later.

http://www.stagecoachbus.com/PdfUploads/Timetable_57957_X1.pdf - New timetable here

Services Affected: X1

Originally Posted: 04 August 2014 6:05 PM



RE: Stagecoach bus changes - Michael - 12 Sep 2014

“Sunderland Pride Carnival” parade in Sunderland City Centre on Sunday 28 September 2014

We have been advised that the "Sunderland Pride Carnival" parade will take place through the City Centre on Sunday 28 September 2014.

Last Updated: 12 September 2014 11:34 AM

To ensure health and safety is maintained, a number of roads will have to be subject to a ‘rolling road closure’, and this will have a substantial effect on bus services.

The parade is scheduled to commence from the Civic Centre at approx 1200, and parade via Burdon Road, Park Road, Toward Road, Borough Road, Fawcett Street, High Street West, St Michaels Way (southbound), Green Terrace, Vine Place and Stockton Road to Park Lane, arriving by no later than 1300.

Although our local authority colleagues will endeavour to ensure that the impact on bus services is as limited as possible, there is nonetheless likely to be traffic congestion in the city centre area, and this may result in disruption to bus services.

During the temporary rolling road closures, buses will normally be required to wait behind the parade, or may use an alternative route if the congestion becomes too severe. As a consequence buses may be subject to delay, or may be temporary diverted around the affected area. As a consequence, buses might not be able to access their normal bus stops in the City Centre area during the parade.

Stagecoach apologise for any inconvenience or delays that this parade may cause, which is due to circumstances beyond our control.

Services Affected: 3, 4, 5A, 10, 11, 13, 16, 20, 23, E1, E2, E6

Originally Posted: 12 September 2014 11:34 AM


RE: Stagecoach bus changes - Michael - 25 Sep 2014

Service 5/5A diversion Killingworth Drive Friday 26 September 2014

On Friday 26 September 2014 Woodland Drive, Sunderland will be closed due to resurfacing and Service 5/5A buses to the City will be diverted.
Last Updated: 25 September 2014 2:01 PM


On Friday 26 September 2014 Woodland Drive, Sunderland will be closed to all traffic due to resurfacing.  Service 5/5A buses towards the City Centre will therefore be unable to use Woodland Drive and Killingworth Drive, and will divert via Wavendon Crescent and Woodville Crescent.  The bus stops on Woodland Drive and Killingworth Drive will not be served during the period of the closure. We apologise for any inconvenience due to this road closure.


Services Affected: 5, 5A

Originally Posted: 25 September 2014 2:00 PM


RE: Stagecoach bus changes - stagecoachbusdepot - 26 Sep 2014

(26 Sep 2014, 12:42 pm)AIG20 wrote Sunderland Illuminations and "FREE" Shuttle Bus! Big Grin

This could be another reason why 16833 and 16839 are now at Sunderland, as the shuttle service is apparently a "Park & Ride".


[url=http://www.stagecoachbus.com/tis-service-update-details.aspx?id=3267&hootPostID=31b233df7f96fdcffb88432c5e14752d][/url]

Would have thought this will be an easyACCESS operation - pretty poor form if it's not as the depot will be full of spares.


RE: Stagecoach bus changes - Michael - 01 Oct 2014

Roadworks at Sunderland Wheatsheaf bus stop, affecting Services 3, 4, 13, 16, E2

From Wednesday 1 October 2014, Sunderland City Council will be undertaking works to improve accessibility at the southbound bus stop at Wheatsheaf.

Last Updated: 30 September 2014 10:15 PM

These works, which will straighten out the kerbline and install a long shelter, are scheduled to be in place for upto 4 weeks.

Whilst there is likely to be some localised disruption to traffic, a temporary bus stop will be located adjacent to the works area.

Stagecoach would like to apologise for any inconvenience or delays these works may cause.

Services Affected: 3, 4, 13, 16

Originally Posted: 30 September 2014 10:15 PM


RE: Stagecoach bus changes - Michael - 03 Oct 2014

Lots of changes on VOSA so far!

PB0001987/1 - CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Middlesbrough Bus Station and Lingfield Park given service number 11/10 effective from 01-Dec-2014. To amend Route and Timetable.

PB0001987/2 - CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Middlesbrough and Hartlepool/North Tees/ Norton Glebe given service number 36/37/38 effective from 30-Nov-2014. To amend Route and Timetable.

PB0001987/5 - CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Port Clarence and Hardwick given service number 58A effective from 30-Nov-2014. To amend Timetable.

PB0001987/17 - CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Middlesbrough Bus Station and Acklam Baldoon Sands given service number 14 effective from 01-Dec-2014. To amend Timetable.

PB0001987/20 - CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Stockton and North Tees Hospital given service number 59 effective from 30-Nov-2014. To amend Route and Timetable.

PB0001987/21 - CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Stockton High Street and Stockton High Street given service number 58 effective from 30-Nov-2014. To amend Timetable.

PB0001987/22 - CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Stockton and Owington Farm given service number 52 effective from 30-Nov-2014. To amend Timetable.

PB0001987/23 - CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Middlesbrough Bus Station and Coulby Newham given service number 12 effective from 30-Nov-2014. To amend Timetable.

PB0001987/207 - CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Stockton and Elton Park given service number 61 effective from 30-Nov-2014. To amend Timetable.

PB0001987/208 - CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Cancellation Accepted: Operating between Middlesbrough Bus Station and Stockton High Street given service number 39 effective from 30-Nov-2014.

PB0001987/211 - CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Cancellation Accepted: Operating between Park End and North Tees Hospital given service number 37 effective from 30-Nov-2014.

PB0001987/220 - CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Middlesbrough Bus Station and Billingham Low Grange given service number 34 effective from 01-Dec-2014. To amend Route and Timetable.

PB0001987/221 - CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Stockton High Street and Billingham High Grange given service number 35 effective from 01-Dec-2014. To amend Route and Timetable.

PB0001987/239 - CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Salters Lane and Hemlington Shops given service number 13 effective from 30-Nov-2014. To amend Route and Timetable.

PB0001987/297 - CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Registration Accepted
Starting Point: Park End
Finish Point: Middlesbrough Bus Station
Via:
Service Number: 39
Service Type: Normal Stopping
Effective Date: 30-NOV-2014
Other Details: New Service Registration.

PB0002404/14 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Eldon Square and Throckley given service number X82/82 effective from 30-Nov-2014. To amend Stopping Places and Timetable.


RE: Stagecoach bus changes - Michael - 03 Oct 2014

Anyone have any idea on the Stockton/Boro changes in December?


RE: Stagecoach bus changes - Kuyoyo - 05 Oct 2014

(03 Oct 2014, 5:56 pm)Michael wrote Anyone have any idea on the Stockton/Boro changes in December?

I know some, but there's only a few that can truely be revealed:

As you might be able to tell from the starting dates, service 58 and 61 will be reintroduced on evenings and Sundays on an hourly bases. As such, evening and Sunday 59s will no longer operate round Hardwick and instead will terminate at North Tees Hospital. An interworking pattern of 59/61/58 is planned - not as good as the old 'Magic Roundabout' evening pattern of years gone by but still. Although the 13 is also listed as the change starting on the Sunday (30th November), not sure yet whether that is also operating evenings/Sundays.